APS Planning: Advanced Planning and Scheduling

Schedules that reflect what your plant can actually produce.

Advanced Planning and Scheduling (APS) takes Microsoft Dynamics 365 Business Central beyond MRP and MPS to finite-capacity, constraint-based scheduling. ERP365 helps New Zealand manufacturers close the gap between plans on paper and reality on the floor.

Why MRP and MPS aren't enough

Production planning often looks great on paper, until real-world capacity, constraints and sequencing expose the gap between plans and execution.

MRP and MPS assume capacity is available; APS plans against the capacity you actually have.

What APS gives your planners

  • Finite-capacity scheduling against real machine and labour limits

  • Constraint & sequence awareness to cut changeovers and waste

  • Realistic, achievable schedules your floor can commit to

  • Faster replanning when demand or capacity shifts

The results manufacturers look for

  • Fewer late orders and less expediting

  • Lower work-in-progress and smoother flow

  • Better on-time-in-full without carrying excess

  • Planners spending less time firefighting

Built on your Business Central data

APS uses your existing Business Central BOMs, routings, work centres and demand - we implement it on top of your current manufacturing setup rather than replacing it.

Frequently asked questions

What's the difference between MRP/MPS and APS?

MRP and MPS assume near-infinite capacity and plan in broad time buckets.

APS plans against finite capacity, constraints and sequencing - so the schedule reflects what your machines and people can actually do, not just what's needed.

What problems does APS solve?

It closes the gap between plans that look great on paper and real-world execution - reducing late orders, excess WIP, expediting and changeover waste, and giving planners a realistic, achievable schedule.

Does APS work with our existing Business Central data?

Yes.

APS builds on your Business Central BOMs, routings, work centres and demand - we implement it on top of your existing manufacturing setup rather than replacing it.

Is this suitable for smaller manufacturers?

Yes.

The value of realistic scheduling applies whether you run a few work centres or many. We scope an approach that fits your size and complexity.

Move from MRP/MPS to APS

Tell us about your production environment and we'll show you what realistic scheduling looks like.

erp365.nz

WHERE WISDOM MEETS THE CLOUD

Image
Contact Us Book ERP Session Call